Shri Krishan Construction India Pvt Ltd

Working notes, face to road head

44 guides, in the order rock moves through a job. Written for the engineer who has to specify the stone and the buyer who has to pay for it.

01 / 09

Drilling

Patterns, rigs and the errors that only show up at the crusher.

The service
02 / 09

Blasting

Vibration limits, powder factor, fly rock and the licences behind a shot.

The service
03 / 09

Mining and quarrying

Opening a face, stripping overburden, bench geometry and the paperwork that moves stone.

The service
04 / 09

Crushing

Three stages, particle shape and the tests an aggregate has to pass.

The service
05 / 09

Crusher plants

Hiring, siting and running a plant on a project, and what a month of it yields.

The service
06 / 09

Aggregate and materials

GSB, WMM and single sizes: gradings, quantities, units and what sets the rate.

The service
07 / 09

Transport

Tipper payloads, cycle times, lead distance and moving a plant across states.

The service
08 / 09

Earthwork

Compaction, quantities, rock cutting and the haul roads everything else runs on.

The service
09 / 09

Highway packages

How the layers, the seasons and the subcontracts of a road job fit together.

Get a rate

A question we have not answered?

Send it with the site and the tonnage. A real package gets a straighter answer than a general one. Send it before 6pm and you will hear back the same day.

01
Location
and the lead to the road head
02
Grading
GSB, WMM, 40 / 20 / 10mm
03
Tonnage
a month, not in total
04
Start date
and how firm it is

Not ready for a rate? The questions buyers ask cover capacity, how long mobilising takes, leases and how billing works.

Read those first

Or call +91 93093 43222 · Monday to Saturday, 9am to 6pm

+91 93093 43222WhatsApp