Burden, spacing, sub-drill and stemming: reading a drilling pattern

By Ashok Kumar7 min read

The short answer

Burden is the distance from a row of holes to the free face. Spacing is the distance between holes along that row. In quarry bench blasting, burden usually starts at 25 to 40 times the hole diameter and spacing at 1.15 to 1.5 times the burden, with about 0.3 of a burden drilled below floor level and 0.7 to 1.0 of a burden left uncharged at the collar as stemming.

A drilling pattern is a drawing with five dimensions on it. Each one is a ratio of the hole diameter or of the burden, which is why a blaster can look at a rig, a bench and a rock face and say roughly what the pattern should be before anybody has opened a calculator. The ratios below are where a design starts. The rock then moves every one of them.

01The five dimensions on the drawing

DimensionWhat it isStarting ratio110 mm hole
Burden (B)Hole row to the free face25 to 40 x diameter2.8 to 4.4 m
Spacing (S)Hole to hole along the row1.15 to 1.5 x B3.5 to 4.5 m at B = 3.0
Sub-drill (J)Drilled below floor level0.3 x B0.9 m
Stemming (T)Uncharged length at the collar0.7 to 1.0 x B2.1 to 3.0 m
Bench height (H)Floor to crest2 to 4 x B6 to 12 m
Table 01 · Starting ratios for bench blasting, with the result for a 110 mm hole

Hard, massive rock sits at the tight end of each range. Soft or well-jointed rock tolerates the wide end.

02Why burden is the number that matters

Every other dimension hangs off the burden, and the burden is the one the rock punishes. Set it too wide and the explosive cannot push the rock forward. The energy goes somewhere else: down into the floor as vibration, back into the wall as cracking behind the last row, and up through the collar. What is left standing at the bottom is a toe, and what lies on the floor is boulders.

Set it too tight and the opposite happens. Rock leaves the face fast and travels. That is fly rock, and it is the fault that ends a quarry's permission to blast. A tight burden also spends explosive and drill metres on rock that would have broken anyway.

The burden that counts is the real one at the toe of the front row, not the one on the drawing. A face that leans back five degrees has more rock in front of the bottom of the hole than in front of the top. This is why a front row is often drilled at an angle to match the face, and why a face survey before drilling is cheap insurance.

03Square or staggered

In a square pattern each hole sits directly behind the one in the row ahead. In a staggered pattern the second row is shifted by half a spacing, so every hole sits behind a gap. Staggering puts each charge closer to the rock it has to break and leaves fewer dead patches between holes, which is why most production benches use it. The geometry that spreads energy most evenly is an equilateral triangle, and that works out to a spacing of 1.15 times the burden.

Wider spacing ratios, up to 1.5 and beyond, come into play with millisecond delays between holes in a row. The delay means each hole fires into a face its neighbour has just made, so the true burden at the moment of firing is no longer the drawn one.

04Bench height against burden

Divide the bench height by the burden and you get the stiffness ratio. It predicts how a shot will behave better than any other single figure on the sheet.

H / BFragmentationFly rock and air blastVerdict
1Poor, with a hard toeSevereRedesign: smaller holes or a higher bench
2FairModerateWorkable with care
3GoodLowWhere most quarries aim
4 and overVery goodVery lowLittle gained beyond this
Table 02 · Stiffness ratio (bench height divided by burden) and what to expect

This is the reason a 110 mm rig does badly on a 3 m bench. Its natural burden is about 3 m, the ratio comes out at 1, and the block behaves like a short thick beam that refuses to bend. Low benches want small holes. That is jackhammer work, covered in which rig drills what.

05Sub-drill and stemming

Rock breaks in a cone from the bottom of the charge, so a hole stopped at floor level leaves humps between holes. Sub-drill is the extra length that carries the charge below grade and cuts the floor flat. About 0.3 of a burden is usual. More than that wastes drilling and shatters the top of the bench underneath, which the next drilling shift then has to collar into. Where the rock has a natural parting at floor level, sub-drill can come down to nothing.

Stemming is the plug that keeps gas in the hole long enough to do work. Too short a column and the shot rifles out of the collar, taking stone with it. Too long and the top of the bench comes down as slabs. The material matters as much as the length: crushed angular chips of roughly 10 to 15 mm lock in the hole, while drill cuttings blow out like dust from a pipe.

06Working back from the crusher

A pattern is not designed to break rock. It is designed to make feed. The primary jaw sets the largest piece that can be swallowed, which is about 80 per cent of the gape, so a jaw with a 900 mm opening wants nothing over 700 mm or so. Every piece bigger than that waits for a breaker while the plant runs light.

Tightening a pattern costs more drill metres and more explosive per cubic metre. Opening it out saves both and hands the bill to the breaker and the crusher. The right pattern is the one with the lowest cost at the stockpile, which is why it helps when drilling and blasting answer to the same firm that runs the plant. The full argument is in oversize at the hopper.

07Drill metres per cubic metre

Once burden, spacing and bench height are fixed, the volume each hole breaks is fixed too, and so is the drilling needed per cubic metre. This is the figure a drilling rate is built on.

Burden x spacing
3.0 m x 3.5 m
Bench height
8.0 m
Rock broken per hole
84 m3 in the solid
Hole length with 0.9 m sub-drill
8.9 m
Rock per hole at 2.7 t/m3
227 t
Specific drilling
0.106 m per m3
Worked example · 110 mm holes on an 8 m bench in hard rock

Put the other way, every metre drilled yields about 25 tonnes of rock. Widen the pattern to 3.5 by 4.2 m in softer ground and the same metre yields 35 tonnes. That gap, multiplied over a month, is most of the difference between two drilling quotations for what looks like the same job.

Standards and rules referred to

  • Design ratios follow standard surface blast design practice as set out in Konya and Walter, Surface Blast Design, and the ISEE Blasters' Handbook.

Clauses are quoted as a working reference. Your contract and the revision it names govern, so check the figure against the document on your own site before building to it.

Asked on the back of this

01What is the thumb rule for burden in blasting?

Twenty-five to forty times the hole diameter, in the same units. A 110 mm hole therefore carries a burden of about 2.8 to 4.4 m. Use the low end in hard, massive rock and the high end in soft or closely jointed rock, then adjust after the first few shots.

02Is spacing always larger than burden?

In production bench blasting, nearly always. Spacing of 1.15 to 1.5 times the burden gives better breakage for the same explosive. The exceptions are pre-split and trim rows along a final wall, where holes are drilled close together on purpose to cut a clean face.

03How much sub-drilling is needed?

About 0.3 times the burden, or roughly eight to twelve hole diameters. Reduce it where the floor follows a bedding plane, and remove it altogether on the last bench above a surface that must not be damaged.

Get a rate

Holes to drill on a live bench?

Enough to price the job properly, and enough to say honestly if we cannot take it. Send it before 6pm and you will hear back the same day.

01
Location
and the lead to the road head
02
Grading
GSB, WMM, 40 / 20 / 10mm
03
Tonnage
a month, not in total
04
Start date
and how firm it is