Shri Krishan Construction India Pvt Ltd

Nothing on this list is hired in

127 machines and vehicles in six groups. Owning them is what lets us put a date against a delivery programme instead of hedging it, because no hire company sets our schedule.

01 / 02Owned inventory

Machine by machine

01 / 06

Crusher plants

Fully owned & operated

06
06
Crusher plants (incl. 250 TPH 3-stage)
Three stages of crushing between blasted rock and finished stock: GSB, WMM, dust, 10mm and 20mm aggregate, screened to the grading the contract asks for.
02 / 06

Excavators

Komatsu · Kobelco · L&T

24
20
Hydraulic excavators
Bench work at the face, overburden stripping and loading out, in heavy and mid-range classes.
04
JCB backhoe loaders
Trenching, backfilling and the small jobs that would otherwise tie up a full-size machine.
03 / 06

Transport fleet

Tata · Ashok Leyland

66
55
Tippers
Bulk aggregate and mineral from the plant yard to the road head, on our own drivers and our own dispatch schedule.
09
Tractors
Yard shifting, water-tanker towing and haul-road dust control.
02
Trailers
Low-beds that carry the crushers and excavators when a plant relocates.
04 / 06

Drilling & blasting

Licensed operations

10
10
Drilling machines
Compressor-fed rock drills putting holes down to the blast pattern, depth and spacing checked before a licensed shotfirer charges them.
05 / 06

Earthmoving & compaction

Road formation ready

11
06
Wheel loaders
Feeding the hopper, building stockpiles and keeping the crusher from ever running empty.
03
Road rollers
Compaction on sub-grade and on the GSB and WMM layers, to the pass count the consultant asks for.
02
Motor graders
Levels and camber on sub-grade and road formation, set before the rollers start.
06 / 06

Site support

Full site support

10
10
Weighbridges
Calibrated and re-checked, so no load leaves unweighed and every invoice line traces back to a docket number.
02 / 02Ownership

Why we carry the standing cost

Iron standing idle costs money every day it stands. We carry that cost for one reason: a plant committed to your package does not get moved to somebody else's, and a breakdown is our repair bill rather than a variation on your contract. Six plants stand in six places, so the answer is sometimes a date instead of a yes.

The SKC fleet drawn up on a project yard: seven tippers, a Bolero and four excavators, with the crew alongside
Plate 01Fleet drawn up on a project yard

Get a rate

Want this fleet on your site?

Plant, tippers and crew travel together and are producing in any state in about a month. Send it before 6pm and you will hear back the same day.

01
Location
and the lead to the road head
02
Grading
GSB, WMM, 40 / 20 / 10mm
03
Tonnage
a month, not in total
04
Start date
and how firm it is

Not ready for a rate? The questions buyers ask cover capacity, how long mobilising takes, leases and how billing works.

Read those first

Or call +91 93093 43222 · Monday to Saturday, 9am to 6pm

+91 93093 43222WhatsApp