Nothing on this list is hired in
127 machines and vehicles in six groups. Owning them is what lets us put a date against a delivery programme instead of hedging it, because no hire company sets our schedule.
Machine by machine
Crusher plants
Fully owned & operated
- Crusher plants (incl. 250 TPH 3-stage)
- Three stages of crushing between blasted rock and finished stock: GSB, WMM, dust, 10mm and 20mm aggregate, screened to the grading the contract asks for.
Excavators
Komatsu · Kobelco · L&T
- Hydraulic excavators
- Bench work at the face, overburden stripping and loading out, in heavy and mid-range classes.
- JCB backhoe loaders
- Trenching, backfilling and the small jobs that would otherwise tie up a full-size machine.
Transport fleet
Tata · Ashok Leyland
- Tippers
- Bulk aggregate and mineral from the plant yard to the road head, on our own drivers and our own dispatch schedule.
- Tractors
- Yard shifting, water-tanker towing and haul-road dust control.
- Trailers
- Low-beds that carry the crushers and excavators when a plant relocates.
Drilling & blasting
Licensed operations
- Drilling machines
- Compressor-fed rock drills putting holes down to the blast pattern, depth and spacing checked before a licensed shotfirer charges them.
Earthmoving & compaction
Road formation ready
- Wheel loaders
- Feeding the hopper, building stockpiles and keeping the crusher from ever running empty.
- Road rollers
- Compaction on sub-grade and on the GSB and WMM layers, to the pass count the consultant asks for.
- Motor graders
- Levels and camber on sub-grade and road formation, set before the rollers start.
Site support
Full site support
- Weighbridges
- Calibrated and re-checked, so no load leaves unweighed and every invoice line traces back to a docket number.
Why we carry the standing cost
Iron standing idle costs money every day it stands. We carry that cost for one reason: a plant committed to your package does not get moved to somebody else's, and a breakdown is our repair bill rather than a variation on your contract. Six plants stand in six places, so the answer is sometimes a date instead of a yes.

Get a rate
Want this fleet on your site?
Plant, tippers and crew travel together and are producing in any state in about a month. Send it before 6pm and you will hear back the same day.
- Location
- and the lead to the road head
- Grading
- GSB, WMM, 40 / 20 / 10mm
- Tonnage
- a month, not in total
- Start date
- and how firm it is
Not ready for a rate? The questions buyers ask cover capacity, how long mobilising takes, leases and how billing works.
Read those firstOr call +91 93093 43222 · Monday to Saturday, 9am to 6pm