Shri Krishan Construction India Pvt Ltd

Earthwork & Excavation

  • Clearing and grubbing
  • Cut and embankment
  • Sub-grade to design density
  • Rollers and graders owned

Earthwork gets paid by the cubic metre. It gets accepted by the millimetre.

Stand on a formation running 40mm high and it looks entirely acceptable. It is not, and correcting it later burns material worth a whole bituminous layer out of somebody's budget. Compaction is the worse of the two, because short density looks exactly like correct density until a field density test says otherwise three weeks later, and by then the layer above is already down on top of it.

Excavators, graders and rollers on cut, fill, sub-grade and compaction, worked to the issued cross-section. We set the job out on the assumption that the consultant will test it, because the consultant will.

A Liugong motor grader and a roller standing on a prepared formation
01 / 02What you get

What we bring to the site

  • 01

    Clearing and grubbing

    Scrub, root systems, topsoil and whatever else is sitting in the alignment. Stripped, then stockpiled for reuse or carted off site, whichever way the contract reads.

  • 02

    Cut and embankment

    Roadway excavation, and fill placed in controlled layers to the grade and cross-section on the drawing. Not end-tipped in a heap and rolled once so it looks right from the road.

  • 03

    Sub-grade and compaction

    Trimmed to level, watered to optimum moisture content, then rolled until the field density says the layer is finished. The graders and rollers are ours, so a wet fortnight does not send them back to a hire yard.

  • 04

    Haul roads

    The roads inside the quarry that everything else depends on. Build one properly and it pays for itself inside a month in tipper tyres alone, before anybody counts the cycle times. Every contractor in the trade knows this. Very few sites do anything about it.

02 / 02Straight answers

Earthwork questions

01Do you work under the client's consultant?

We do. Levels, layer thickness and density go to whoever the contract nominates, and the work is built to survive the test rather than to photograph well on handover day.

02Can you do earthwork without the mining and crushing?

Yes. In practice most of our earthwork runs alongside a crusher on the same package, but where it stands on its own it is scoped and rated on its own.

Get a rate

Need earthwork on your site?

Enough to price the job properly, and enough to say honestly if we cannot take it. Send it before 6pm and you will hear back the same day.

01
Location
and the lead to the road head
02
Grading
GSB, WMM, 40 / 20 / 10mm
03
Tonnage
a month, not in total
04
Start date
and how firm it is

Not ready for a rate? The questions buyers ask cover capacity, how long mobilising takes, leases and how billing works.

Read those first

Or call +91 93093 43222 · Monday to Saturday, 9am to 6pm

+91 93093 43222WhatsApp