Shri Krishan Construction India Pvt Ltd

Eight sites live today, 1.9 crore tonnes already weighed

Client, package and quantity against every entry. The figures come off weighbridge dockets, so none of them are rounded up to read better.

Sites running now
8
Delivered on record
1.9 crore MT
States worked
10
Longest single package
98.73 km
01 / 02Running now

Live sites

Eight packages in production at once, across four states. Keeping that many fed is a scheduling job before it is a machinery job, and the count stays at eight because eight is what we can supervise properly.

  1. 01Prayagraj, Uttar Pradesh

    Prayagraj Ring Road

    Kaluwala Construction Pvt. Ltd.

  2. 02Nanded to Jalna, Maharashtra

    Nanded to Jalna Expressway

    PNC Infratech Ltd.

  3. 03Bharuch, Gujarat

    Bharuch to Dahej Road

    GHV Infra

  4. 04Ujjain to Jaora, Madhya Pradesh

    Ujjain to Jaora Greenfield Highway

    MKC Infrastructure Ltd.

  5. 05Bara, Uttar Pradesh

    Bajarang Stone Crusher Plant

    Shri Krishan Construction · owned plant

  6. 06Dahiwadi, Maharashtra

    Phaltan to Dahiwadi Road, NH-160

    Kaluwala Construction Pvt. Ltd.

  7. 07Beed, Maharashtra

    Beed Regional Connectivity, NH-52 and NH-561A

    Kaluwala Construction Pvt. Ltd.

  8. 08Bhopal, Madhya Pradesh

    Western Bhopal Bypass, NH-46

    PNC Infratech Ltd. for MPRDC

02 / 02Delivered

Completed projects

Eleven packages closed out across Andhra Pradesh, Bihar, Uttar Pradesh, Madhya Pradesh, Maharashtra, Manipur, Karnataka and Jharkhand, and below them the Barmer plant, which is not closed out at all: it was the first the firm owned and it is still producing. Moving plant that far is mostly paperwork and patience.

  1. 01

    Srisailam Canal Project

    Andhra Pradesh

    Mining, blasting, drilling and transportation

    First package for PNC Infratech, and the reference that got the firm onto canal and national highway work in the first place.

    PNC Infratech Ltd.

    2016 – 2017

    12,00,000 MT

  2. 02

    Patna to Buxar Road

    Bihar

    Mining, blasting, drilling and transportation

    Still the largest tonnage we have moved on a single package, and every load of it crossed a weighbridge.

    PNC Infratech Ltd.

    2017 – 2018

    30,00,000 MT

  3. 03

    Jhansi to Khajuraho Road

    Uttar Pradesh and Madhya Pradesh

    Mining and boulder transportation

    PNC Infratech Ltd.

    2018 – 2019

    25,00,000 MT

  4. 04

    Maharashtra Samruddhi Mahamarg

    Maharashtra

    Mining, blasting, drilling and transportation

    Deccan basalt, on the expressway the whole trade was watching. The figure is quoted to the tonne because that is what the dockets add up to, not because it reads well.

    PNC Infratech Ltd.

    2019 – 2020

    23,50,863 MT

  5. 05

    Imphal to Kangchup to Tamenglong Road, Section IIA

    Manipur

    Mining, blasting, drilling and transportation

    North-east hill terrain, two thousand kilometres from Churu. Moving plant, crew and spares up there was most of the difficulty; the rock was the easy part.

    ABCI Infrastructure Pvt. Ltd.

    2020 – 2021

    10,00,000 MT

  6. 06

    Tamenglong to Mahur Paved Shoulders Road, NH-137, Package 02

    Manipur

    Mining, blasting, drilling and transportation

    Jandu Construction India JV Niraj Cement Structurals

    2020 – 2021

    10,00,000 MT

  7. 07

    Challakere to Hiriyur Road

    Karnataka

    Mining, blasting, drilling and transportation

    Granite, and hard with it. New bits, quicker liner wear, penetration rates well down on basalt, and a straight lesson in what the fleet takes before output starts to drop.

    PNC Infratech Ltd.

    2021 – 2022

    20,00,000 MT

  8. 08

    Banda Crusher Plant

    Banda, Uttar Pradesh

    Mining, blasting, drilling, breaking and boulder transport to hopper

    AHVS Infra LLP

    2022 – 2023

    12,00,000 MT

  9. 09

    Jharkhand Package

    Jharkhand

    Drilling, blasting, transport and crushing, boulder and aggregate supply

    AHVS for PNC Infratech

    2022 – 2023

    8,00,000 MT

  10. 10

    Prayagraj Crusher Plant, four-lane widening

    Prayagraj, Uttar Pradesh

    Drilling, blasting, breaking, transport and crushing of GSB, WMM, dust, 10mm and 20mm

    MKC Buildcon Ltd.

    2023 – 2024

    10,00,000 MT

  11. 11

    Balaghat to Gondia Section, NH-543

    Balaghat, Madhya Pradesh

    Drilling, blasting, breaking, transport and crushing of GSB, WMM, dust, 10mm and 20mm

    Kaluwala Construction Pvt. Ltd.

    2023 – 2024

    20,00,000 MT

  12. 12

    Crusher Plant Shri Kheteshwar

    Brahamdham Tirth, Asotra, Barmer, Rajasthan

    Aggregate crushing and material production

    The first plant the firm owned outright. Eighteen years on, it is still producing.

    Shri Krishan Construction · owned plant

    2008 onwards

    8,00,000 MT

Every quantity above is weighed and invoiced, not estimated. The Samruddhi Mahamarg figure carries its odd tonnes because that is exactly what the dockets added up to.

Get a rate

Package coming up for award?

Enough to price the job properly, and enough to say honestly if we cannot take it. Send it before 6pm and you will hear back the same day.

01
Location
and the lead to the road head
02
Grading
GSB, WMM, 40 / 20 / 10mm
03
Tonnage
a month, not in total
04
Start date
and how firm it is

Not ready for a rate? The questions buyers ask cover capacity, how long mobilising takes, leases and how billing works.

Read those first

Or call +91 93093 43222 · Monday to Saturday, 9am to 6pm

+91 93093 43222WhatsApp