The short answer

GSB, granular sub-base, is the lower layer: a coarser material with a top size of 53 or 75 mm, placed on the subgrade to spread load and let water drain out. WMM, wet mix macadam, is the base course above it: a dense, closely graded crushed stone of 53 mm and below, mixed with water in a plant and laid by paver. Both are compacted to 98 per cent of maximum dry density. WMM carries tighter limits on strength and particle shape.

The two are laid one on top of the other, come off the same plant and look alike in a stockpile to anyone outside the trade. They are specified in different clauses, made differently and tested to different limits, and one cannot stand in for the other.

01Side by side

GSB, Clause 401WMM, Clause 406
PositionOn the subgradeOn the GSB, under the bituminous layers
Main jobSpread load, drain water sidewaysCarry traffic stress
Material allowedNatural sand, crushed gravel, crushed stone or a blendCrushed stone
Top size75 mm or 53 mm, by grading53 mm, with 95 to 100% passing 45 mm
GradingsSix, numbered I to VIOne
Passing 75 micronUnder 5% in I to IV0 to 5%
StrengthImpact value 40 maxLos Angeles 40 max, or impact value 30 max
Particle shapeNo limit statedFlakiness and elongation combined, 35% max
Plasticity of finesLiquid limit 25 max, PI 6 maxPI 6 max
CBR30 min at 98% densityNot specified
MixingBlended and watered before rollingIn a mixing plant, at optimum moisture
Compaction98% of maximum dry density98% of maximum dry density
Layer thicknessUp to 200 mm in one layer with a vibratory roller75 mm minimum, 200 mm maximum
Table 01 · GSB and WMM compared under the MoRTH specification

MoRTH Specifications for Road and Bridge Works, Fifth Revision. Your contract's own schedule governs where it differs.

02Why a road needs both

A wheel load is concentrated at the surface and spreads as it goes down. Near the top the stress is high, so the material has to be strong, dense and well interlocked. That is WMM. Lower down the stress is much reduced, and a cheaper, coarser material will do. That is GSB.

The sub-base has a second task that the base does not. Water gets into every pavement, through cracks and from the sides, and it has to be let out before it softens the subgrade. An open-graded sub-base carries it to the edge. A dense base course above keeps most of it from getting in.

03How each is made

GSB is a blend of coarse and fine fractions taken after the secondary crusher, proportioned to fall inside one of the six grading bands. Where a suitable natural gravel exists it may be used with little or no crushing. The six bands and which to choose are in GSB grading under Clause 401.

WMM is made from single-size fractions, typically 40 mm, 20 mm, 10 mm and dust, fed in set proportions into a pugmill where water is added. It leaves the plant as a damp, uniform mix and goes straight to the paver. The grading and the rules for laying it are in WMM under Clause 406.

04Where each goes wrong

  • GSB with too many fines. Soil from the top of the bench gets into the feed, the share passing 75 micron climbs past 5 per cent and the plasticity index rises. The layer now holds water instead of shedding it.
  • GSB that segregates. A wide-graded material tipped from height separates into coarse and fine. Coarse pockets will not compact, and fine pockets hold water.
  • WMM mixed dry. Without moisture the fines will not bind and the roller cannot reach density.
  • WMM made from flaky stone. Flat particles break under the roller and the grading changes after it has been approved.
  • Either one laid on a wet formation. The layer below pumps up through it.

05Can GSB be used in place of WMM?

No. GSB may contain natural rounded material, has no limit on particle shape and is allowed a much weaker stone. In the base course it would rut. Using WMM as sub-base is permitted in the sense that it exceeds the requirement, but it costs more and drains less well than an open sub-base grading, so nobody does it by choice.

06What it means for the order

GSB is cheaper per tonne because it needs less crushing and no mixing plant. WMM costs more for the opposite reasons. On a typical highway section the two together are the largest tonnage on the job, which is why the quantity is worth working out early: see how much GSB and WMM a kilometre needs.

Standards and rules referred to

  • MoRTH Specifications for Road and Bridge Works, Fifth Revision, Clauses 401 and 406, Tables 400-1, 400-2, 400-12 and 400-13.

Clauses are quoted as a working reference. Your contract and the revision it names govern, so check the figure against the document on your own site before building to it.

Asked on the back of this

01What is the full form of GSB and WMM?

GSB is granular sub-base. WMM is wet mix macadam. GSB is the layer directly on the subgrade, and WMM is the base course laid on top of it.

02Which is laid first, GSB or WMM?

GSB. It goes on the compacted subgrade. WMM is laid over the finished GSB, and the bituminous layers over the WMM.

03Is the compaction requirement the same for GSB and WMM?

Yes under MoRTH: both are compacted to at least 98 per cent of the maximum dry density found by the heavy compaction test, IS 2720 Part 8.

Get a rate

Tonnes to land at a road head?

Enough to price the job properly, and enough to say honestly if we cannot take it. Send it before 6pm and you will hear back the same day.

01
Location
and the lead to the road head
02
Grading
GSB, WMM, 40 / 20 / 10mm
03
Tonnage
a month, not in total
04
Start date
and how firm it is

Not ready for a rate? The questions buyers ask cover capacity, how long mobilising takes, leases and how billing works.

Read those first

Or call +91 93093 43222 · Monday to Saturday, 9am to 6pm

+91 93093 43222WhatsApp