WMM under MoRTH Clause 406: grading, moisture and laying

By Ashok Kumar5 min read

The short answer

Wet mix macadam is crushed stone graded from 53 mm down to fines, with 0 to 5 per cent passing 75 micron, mixed with water in a plant at optimum moisture and compacted to 98 per cent of maximum dry density. The stone must show a Los Angeles abrasion value of 40 or less, or an impact value of 30 or less, and a combined flakiness and elongation index of no more than 35 per cent.

WMM is the layer that does most of the structural work in a flexible pavement and receives the least attention on many sites. It has one grading, a short list of limits and a method of laying that is easy to describe and easy to cut corners on.

01The grading

IS sievePer cent passing
53.00 mm100
45.00 mm95 - 100
22.40 mm60 - 80
11.20 mm40 - 60
4.75 mm25 - 40
2.36 mm15 - 30
600 micron8 - 22
75 micron0 - 5
Table 01 · Grading for wet mix macadam, per cent passing by weight (MoRTH Clause 406)

Read down the column and the shape of the mix appears. Between a fifth and two-fifths of the material is coarser than 22.4 mm. Between a quarter and two-fifths is finer than 4.75 mm. Very little is dust. It is a dense grading: each size fills the gaps left by the size above, so that after rolling there is almost no room for a stone to move.

02The stone

TestLimitMethod
Los Angeles abrasion value40% maximumIS 2386 Part 4
or Aggregate impact value30% maximumIS 2386 Part 4, or IS 5640
Combined flakiness and elongation index35% maximumIS 2386 Part 1
Table 02 · Physical requirements of coarse aggregate for WMM (MoRTH Table 400-12)

Either strength test may be used. Where water absorption exceeds 2 per cent, a soundness test under IS 2386 Part 5 is required. The plasticity index of the material finer than 425 micron must not exceed 6.

The shape limit is the one that separates WMM from sub-base. Flat and long particles bridge instead of packing, and they snap under a vibratory roller. How the index is measured and what a plant can do about it are in flakiness and elongation index.

03Blending the fractions

A plant does not produce WMM directly. It produces 40 mm, 20 mm, 10 mm and dust, and these are fed from separate bins into a pugmill in proportions found by sieve analysis. A common starting point is about a quarter 40 mm, a quarter 20 mm, a fifth 10 mm and the rest dust. That is a place to begin the trial, not a recipe. The fractions from each plant grade differently and the proportions have to be worked out for the stone in the bins.

04Moisture

The word wet in the name is exact. Water is added in the mixer to bring the material to its optimum moisture content, the moisture at which a given compactive effort produces the highest density. Too dry and the fines will not bind. Too wet and the roller pumps slurry to the surface and the layer shoves.

Optimum moisture is found by the heavy compaction test, IS 2720 Part 8. Because the test mould cannot take large stone, the fraction retained on 22.4 mm is replaced with material between 4.75 and 22.4 mm before testing. Allow for evaporation between the plant and the paver on a long haul or a hot afternoon.

05Laying and rolling

  1. Check the surface of the GSB for level, density and loose material. Dampen it lightly if it is dry.
  2. Spread the mix by paver finisher to the loose thickness that will compact to the design layer.
  3. Do not handle it more than necessary. Every extra tip and rake separates coarse from fine.
  4. Roll with a vibratory roller from the lower edge towards the upper, overlapping each pass, until density is reached.
  5. Finish the surface true to camber. Do not correct levels with a skim of fines.
  6. Keep traffic off, let the layer dry, and apply the prime coat before any bituminous course.

A single compacted layer must be at least 75 mm thick and may be up to 200 mm where the vibratory compaction and the engineer's approval allow it. Thicker bases are laid in two layers. Compaction is to at least 98 per cent of maximum dry density.

06Where WMM fails on site

  • Segregation at the edges of the mat, where coarse stone rolls off the screed.
  • Mix delivered below optimum moisture after a long haul.
  • Rolling stopped at a pass count instead of at a measured density.
  • Low spots made up with fines, which then ravel under the prime coat.
  • Construction traffic run over the unsealed layer, loosening the surface.

Most of these are habits, not material faults. The comparison with the layer below is in GSB vs WMM, and the tonnage for a section in quantity per kilometre.

Standards and rules referred to

  • MoRTH Specifications for Road and Bridge Works, Fifth Revision (2013), Clause 406, Tables 400-12 and 400-13.

Clauses are quoted as a working reference. Your contract and the revision it names govern, so check the figure against the document on your own site before building to it.

Asked on the back of this

01What is the maximum size of aggregate in WMM?

53 mm, with 95 to 100 per cent required to pass the 45 mm sieve. In practice the coarsest fraction fed to the mix is 40 mm aggregate.

02What is the compaction requirement for WMM?

At least 98 per cent of the maximum dry density determined by IS 2720 Part 8.

03What is the minimum and maximum thickness of a WMM layer?

A single compacted layer is not less than 75 mm and may go up to 200 mm with suitable vibratory compaction and the engineer's approval.

Get a rate

Tonnes to land at a road head?

Enough to price the job properly, and enough to say honestly if we cannot take it. Send it before 6pm and you will hear back the same day.

01
Location
and the lead to the road head
02
Grading
GSB, WMM, 40 / 20 / 10mm
03
Tonnage
a month, not in total
04
Start date
and how firm it is

Not ready for a rate? The questions buyers ask cover capacity, how long mobilising takes, leases and how billing works.

Read those first

Or call +91 93093 43222 · Monday to Saturday, 9am to 6pm

+91 93093 43222WhatsApp